AGI, Abbie Gregg, Inc.
> Start Up Consulting
> Cleanroom & Lab Design
Imaging Space Design
> Design Review
> Cleanroom and Lab Cost
> Estimating

> Modeling
> Process Improvements
> Technical Documentation
> Equipment Engineering
> Tool Relocation/Maintenance
> Tool Installation Design
> Toxic Gas Monitoring
> Forensic and Tool Inspection
> High Tech Operations / IE
> Consulting Studies
> Site Selection / Survey
> Supplier Ecosystem
> Economic & Tech Park
> Development

> Recruiting
> Training
  tool installation design projects
   
  The University of Connecticut | UCONN Tech Park - Innovation Partnership Building
Technology Park visioning // Masterplan for Technology Park // Programming for phase I building // Site evaluation & selection // Core & shell building design support // Specialty labs design: Advanced Characterization Labs (ACL), Additive Manufacturing Innovation Center (AMIC) // Tool Installation Design
   
  eMagin | Super Complex Cluster Tool for OLED Display Processing
Facility Survey / Recommendations for Best Location of New Tool // Development of Facility Upgrade and Services Design Documents // Tool Installation Design and Construction Support
   
  King Abdullah University of Science and Technology (KAUST) | Advanced Nanofabrication Cleanroom
Nanotechnology Cleanroom // Cleanroom Design: Programming thru Construction Documents // Construction Administration // On Site Cleanroom Contractor Supervision // Tool Procurement Support / Specification Development / Negotiation with Vendors / Factory Acceptance Testing // Tool Installation Design and Construction Supervision // Shipping Logistics Support for Tools and Cleanroom Related Items // Materials and Supplies Procurement for Start-up // EHS and Code Consulting // Tool Procurement Support for Thin Films Labs // Project Management for Bulk Nitrogen
   
  Skyworks Solutions, Inc. | 4 to 6 Inch Conversion
Fab Operational During Upgrade // On Site Industrial Engineering Support for Wet/Dry Etch, Thin Films, Materials and Supplies // Facilities Systems Analysis // Utility Matrix Development // Cleanroom Re-Layout to Accommodate Six Inch Tools // On Site Tool Installation Support
   
  University of Pennsylvania | Wolf Nanofabrication Facility (WNF) Infrastructure Renovations
Nanotechnology Cleanroom // HPM Corridor and Storage Areas // Infrastructure Upgrades: Process, HVAC, Architectural, and Life Safety Systems // Cleanroom Design: Programming thru Construction Documents // Layout // Utility Matrix // Tool Research and HPM Analysis // Specialty Systems Design // Tool Installation Design
   
  Arizona State University | ASU CREATE Annual Courses
Instructor on Tool Installation Design and Construction since 2000 // Annual Seminars and Classes
   
  Arizona State University | Flexible Display Center
Assisted Development of Technical Plan and Road Map // Developed Tool List, 6-inch and Gen II // Building Evaluation (Facilities Infrastructure) and Utilization Plan // Cleanroom Audit // On-site Operations and Start-up Support // Tool Installation Design and Supervision // Facility Reconfiguration Support
   
  Qualcomm MEMS Technologies | MEMS Display Start Up Consulting
Facility/Tool Install Design Review // Documentation and training of Fab and Assembly Processes, Facilities, Environmental Health and Safety, and Cleanroom Protocol // Acceptance testing of process equipment // Development of materials and supplies requirements // Capacity Modeling, Front End / Back End
     
    Duke University | Fitzpatrick Center for Interdisciplinary Engineering, Medicine and Applied Sciences (FCIEMAS)
Cleanroom Design: Program through Construction Documents // Tool Installation Design // Nanotechnology and Bio Cleanroom, Characterization, and MBE // Class 10 to class 1,000 // Layout // Utility Matrix // HPM Analysis // Tool Research // Vibration and EMI Consulting and Abatement // Accommodate Relocated and New Tools
     
    University of California at Riverside | CNSE, Bourns Hall Cleanroom
Cleanroom and Characterization Programming, Design, and Construction Support (Design-Build Project) // E-Beam Lithography // Layout // Utility Matrix // HPM Analysis // Tool Research and Negotiation // Vibration and EMI Consulting and Abatement Recommendations // Process Engineering Support for Tool Evaluation, Acceptance and Start-up
     
    University of Michigan | SSEL Cleanroom Expansion and Dr. Steve Forrest Labs
Cleanroom Design: Programming through Construction Documents, and Feasibility Studies // Layout (As Built and Proposed Expansion) // Utility Matrix // Specialty Systems and HVAC Consulting // HPM Analysis // Tool Installation Design // Relocation of OLED, Display, and MBE custom tools from Princeton to University of Michigan
     
    Texas Instruments (fka Unitrode) | 150mm BiCMOS Wafers
Fab Start-Up and Qualification // Tool installation and acceptance // Wafer process start-up, specifications and process development // Etch, Diffusion, CVD
     
    FlipChip Technologies | Bump Wafer Fab
Tool Rigging // Wall Reconfiguration // Tool Positioning and Fit Up
     
    Eastman Kodak | OLED FPD Pilot Line
Factory analysis, cost model, equipment specification, equipment procurement, layout, facility design and construction // Engineering support for R&D and pilot line facility // Fit up support // Process specification development and outsourcing // Site selection factory model, conceptual design for pilot line scale-up // Color filter technology, process & cost analysis // Process Engineering and Technology Transfer Support
     
    Optical Imaging Systems, Inc. | AMLCD Pilot Demonstration Facility
Equipment Maintenance Management and Tool Installation // First in the USA // Conceptual Design, Bid Specs, Layout, Construction Management, Fit-Up design and supervision // Material Handling System Design – Front opening unified pod with minienvironment (KPOD)