AGI, Abbie Gregg, Inc.
> Start Up Consulting
> Cleanroom & Lab Design
Imaging Space Design
> Design Review
> Cleanroom and Lab Cost
> Estimating

> Modeling
> Process Improvements
> Technical Documentation
> Equipment Engineering
> Tool Relocation/Maintenance
> Tool Installation Design
> Toxic Gas Monitoring
> Forensic and Tool Inspection
> High Tech Operations / IE
> Consulting Studies
> Site Selection / Survey
> Supplier Ecosystem
> Economic & Tech Park
> Development

> Recruiting
> Training
  cleanroom and laboratory design experience
   
  Osceola County Florida | Florida Advanced Manufacturing Research Center (FAMRC)
Cleanroom, Imaging, and HPM Rooms Design through Construction Documents, and Construction Administration Services // Process Analysis and confirmation of User requirements // Tool List, Tool Analysis, Tool Cut Sheet, and CAD Footprint // CAD Drawings and Building Background Integration // Room and Area Layouts, Room Conditions, Utility Matrix // Code Consulting
   
  Vanderbilt University | Engineering and Science
Industrial and Process engineering services to support Schematic Design, Design Development (design review only), Construction Documents (design review only), Bidding Support and Construction Administration Support // Lab planning, architectural services, and engineering for: Cleanroom and support spaces including utility chases, gowning room(s), and staging areas // Imaging / characterization spaces // HPM rooms and lab areas
   
  Georgia Institute of Technology | Marcus Nanotechnology Research Center Microscopy and Imaging Center
AGI benchmarked other successful imaging projects and assisted the Architect to optimize the tool layout and room design. The existing space had many constraints including height, existing utilities and adjacent MEP equipment rooms. The tool requirements were very stringent for temperature control, Vibration, EMI and Acoustical noise. // AGI provided the Imaging certification and acceptance testing spec, coached the commissioning team and reviewed results, which were successful. // Design Review/Assist: // Microscopy / Imaging Laboratory functionality // HVAC and mechanical piping design // EMI, Vibration and Acoustics // Electrical and Structural design // Accessibility and maintainability of critical mechanical equipment serving the labs. // Recommended approach for lab fit-up and tool hook-up.
   
  University of California – Irvine | TEM Facility
Site Evaluation & Selection // EMI, Vibration, Acoustics Testing for multiple sites under consideration for the proposed center // Programming for several location options on the UCI campus – Renovation vs. Greensite // Core & Shell building design support: MEP and Architectural for EU3 site // Specialty labs design: 4 TEM Facilities, FIB / SEM, and Prep Labs // Preliminary ROM Cost Estimates
   
  University of California – Davis | Kemper Hall
Cleanroom Renovation

Site Tour of proposed spaces // Hazardous Process Materials Study with Code Analysis // High Level Site Assessment Study Report // Test to Fit – Verification // Cost Benchmarking for equipment, tools and construction // Preliminary ROM / Cost Estimates // Full Design Services – Programming through Construction Documents // Tool Hook-Up Design // Construction Administration Services // Feasibility Study for Offsite Growth Lab
   
  University of California, Irvine | Brain Mapping Center
Site Tour of proposed space // Analysis of Equipment, Pharmacy and Patient Flow for “Test to fit” // Preliminary ROM Cost Estimation // EMI, Vibration, Acoustics Testing for multiple sites under consideration for the proposed center
   
  The University of Connecticut | UCONN Tech Park - Innovation Partnership Building
Technology Park visioning // Masterplan for Technology Park // Programming for phase I building // Site evaluation & selection // Core & shell building design support // Specialty labs design: Advanced Characterization Labs (ACL), Additive Manufacturing Innovation Center (AMIC) // Tool Installation Design
   
  Massachusetts Institute of Technology  | MIT.nano
Nano-Materials, Structures and Systems Facility

Entire project designed in Revit // 41,000 NSF, 2 floors of Cleanroom with partial Subfab // Class 100, 1,000 and 10,000 Spaces (ISO Class 5, 6, 7) // 13,200 NSF dedicated PI Cleanrooms for MOCVD, MBE, Roll to Roll, and other technologies // 18,000 NSF below grade Imaging // 2,600 NSF HPM areas with systems serving 3 above-grade floors // Cleanroom, Imaging and Lab design- Site Survey, Feasibility Study, Programming, Schematic Design, Wet hood study // Layout and Utility Matrix Development // Tool Research and HPM Analysis // Vibration and EMI Consulting // Specialty Systems Design // Gas and Chemical Analysis // Value Engineering
   
  University of Southern California | Michelson Center for Convergent Bioscience
Currently in Design, Construction Estimated 2015 // 7,500 SF Cleanroom // 7,200 SF Imaging Suite // Approximately 185,000 Gross SF in Project // 80,000 Net Assignable SF // Class 100, 1000 Nanofabrication Cleanroom // Advanced Electron Microscopy Imaging Suites // Cleanroom, Imaging, and HPM Rooms Design // Layout and Utility Matrix Development // Gas and Chemical Analysis // Code Consulting // BIM and Cobie model for all Nano and HPM areas
   
  SUSS MicroTec |  Demonstration Cleanroom
Class 10 Demonstration Cleanroom // Cleanroom Design: Programming through Construction Documents // Construction Administration Services // Layout // Utility Matrix Development // Gas and Chemical Analysis // Code Consulting
   
  University of Chicago  |  William Eckhardt Research Center (WERC)
Nanotechnology Cleanroom // Urban Area Issues Including Interface to Adjacent Buildings // Waffle Slab, Multi-Story Building, Portions Below Grade // Class 10, 100, and 1,000 Spaces // E-Beam Lithography // Imaging Suite, Biotech Laboratories, MBE // Cleanroom Design: Programming through Construction Documents // Layout and Utility Matrix Development // Tool Research and HPM Analysis // Vibration, Acoustics and EMI Consulting // Specialty Systems Design // Gas and Chemical Analysis Code Consulting
   
  University of Massachusetts Lowell  |  Emerging Technology and Innovation Center (ETIC)
Nanotechnology Cleanroom // Class 100, 1,000 and 10,000 Spaces // E-Beam Lithography // Biotech Laboratories // HPM Room // Cleanroom Design: Programming through Construction Documents // Layout and Utility Matrix Development // Tool Research and HPM Analysis // Vibration and EMI Consulting // Specialty Systems Design // Gas and Chemical Analysis // Value Engineering
   
  King Abdullah University of Science and Technology (KAUST) | Advanced Nanofabrication Cleanroom
Nanotechnology Cleanroom // Cleanroom Design: Programming thru Construction Documents // Construction Administration // On Site Cleanroom Contractor Supervision // Tool Procurement Support / Specification Development / Negotiation with Vendors / Factory Acceptance Testing // Tool Installation Design and Construction Supervision // Shipping Logistics Support for Tools and Cleanroom Related Items // Materials and Supplies Procurement for Start-up // EHS and Code Consulting // Project Management for Bulk Nitrogen
   
  Harvard University | Laboratory for Integrated Science and Engineering (LISE)
Nanotechnology Cleanroom // Urban Area Issues Including Interface to 4 Adjacent Buildings // Class 10, 100, and 1,000 Spaces // Waffle Slab, Multi-Story Building, Portions Below Grade // E-Beam Lithography // Imaging Suite and Biotech Laboratories // Materials Synthesis / MBE / MOCVD // Cleanroom Design: Programming through Construction Documents // Construction Administration // Layout and Utility Matrix Development // Tool Research and HPM Analysis // Vibration and EMI Consulting // Specialty Systems Design // Demolition and Site Work Plan Review // Gas and Chemical Analysis // Value Engineering
   
  Duke University | Fitzpatrick Center for Interdisciplinary Engineering, Medicine and Applied Sciences (FCIEMAS)
Nano and Bio Cleanrooms // Class 100 and Class 1,000 Cleanrooms // E-Beam Lithography // Characterization and Prep Areas, including Advanced Imaging // MBE Area, HPM and Class 100,000 Zone // Facilities Support Areas, HPM Corridor and Storage Areas // Cleanroom, Characterization and MBE Area Design: Programming thru Construction Documents // Construction Administration // Tool Install // Layout // Utility Matrix // HPM Analysis // Chemical and Gas Analysis // Tool Research // Vibration, Acoustics, and EMI Consulting and Abatement Recommendations // Operational and Financial Model for the Center
     
    PerkinElmer Optoelectronics | XRay Imager TFT Fab
Fab Expansion Design and Construction Support // Fab Audit and Operational Improvement Consulting // Tool procurement and Qualification Support
     
    University of Louisville | Belknap Research Center Cleanroom
Nano and Bio Cleanrooms // Class 100 and Class 1,000 Areas // Facilities Support Areas // HPM Storage Areas // Peer Review of Design // Alternate Design Recommendations // Risk / HPM Analysis // Chemical and Gas Analysis and Specifications // Tool List // Layout // Utility Matrix // Vibration and EMI Consulting // Wet Hood Design and Specification // Reflected Ceiling Plan
     
    University of Pennsylvania | Wolf Nanofabrication Facility (WNF) Infrastructure Renovations
Nanotechnology Cleanroom // HPM Corridor and Storage Areas // Infrastructure Upgrades: Process, HVAC, Architectural, and Life Safety Systems // Cleanroom Design: Programming thru Construction Documents // Layout // Utility Matrix // Tool Research and HPM Analysis // Specialty Systems Design // Tool Installation Design
     
    Arizona State University | The Biodesign Institute, Phases I & II
Alternate Sites Analyzed for Vibration and EMI // Vibration and EMI Analysis and Recommendations for Abatement // Verification of EMI Abatement // Peer Review and Layout of BSL3 Lab Suites // HVAC Review for BSL3 Capability
     
    Arizona State University | Design of BSL3 Compliant Labs (Multiple Locations)
Layout // Isolation / Access // Biosafety Cabinet Specification
     
    Lawrence Berkeley National Labs | Molecular Foundry Cleanroom
Nanotechnology Cleanroom // Class 100-1,000 // Multilevel Building, Imaging Space below Cleanroom // State-of-the-Art 300mm E-Beam Litho, Soft Litho // FIB, SEM // Phased Buildout // Layout, Including Phasing // Utility Matrix // Tool Research // Cleanroom Design: Programming through Construction Documents // Construction Administration // Specialty Systems and Minienvironment Design // HVAC Consulting // EMI and Acoustical Noise Studies and Consulting // HPM / Chemical and Gas Analysis and Recommendations // 3D Architectural Rendering of Cleanroom
     
    University of California Riverside | Center for Nanoscale Science and Engineering (CNSE)
Bourns Hall Renovation // Nanotechnology Cleanroom // Class 100 and 1,000 // Characterization Area // Remodel and Upgrade of Facilities Support Areas // E-Beam Lithography // Cleanroom and Characterization // Programming // Design and Construction Support (Design-Build Project) // Site and Facilities Survey // Layout // Utility Matrix // HPM Analysis // Permitting Support // Tool Research and Negotiation // Vibration and EMI Consulting and Abatement Recommendations // Operational Financial Modeling for the Center // Process Engineering Support for the Tool Evaluation, Acceptance and Start Up
     
    Motorola Life Sciences | Bio Safety Lab (BLSII/III) Design and Construction
Biochip Lab and Manufacturing Cleanroom Expansion // Relocation Project Planning // Tool List // CAD Footprints // Utility Matrix
     
    Argonne National Labs | Center for Nanoscale Materials (CNM)
Nanotechnology Cleanroom // Layout of Labs and Cleanroom // Utility Matrix // Tool and Equipment Consulting // Conceptual Design Review
     
    Oak Ridge National Labs | Center for Nanophase Materials Science (CNMS)
Nanotechnology Cleanroom // Design Review
     
    Rockwell Collins | LCD Fab Renovation
Programming // Design // Budgeting // Layout // Utility Matrix
     
    Citala | New Flexible Display Fab
Roll to Roll Processing // Programming // Layout // Tool Analysis // Process Analysis
     
    Atmel | Operating Fab Building Acquisition
137,000 square foot Cleanroom // Site Evaluations to accommodate 0.18 micron process // Class 1 to Class 1,000 // Multi Level Fab, 2 Subfab Levels, Fan Deck, Ballroom // Layout for 200mm Tools // Utility Matrix // Room Condition Evaluation // Capacity Analysis // HPM Analysis
     
    Micron Technologies | 300mm Wafer Fab DRAM
Industrial Engineering // Layout // Utility Matrix // Capacity Study
     
    Amkor | High Volume Assembly and BGA Renovation
Layout and Utility Matrix Consulting // Utility Distribution Analysis
     
    Philips Semiconductors | Phased Renovation
BiCMOS, 0.25 to 0.18 Micron, 150mm and 200mm Wafer Fabs // SMIF Introduction // 75,000 Square Foot Renovation, including CMP Area // Class 10 to Class 1,000 // Utility Matrix, Equipment and Room Layouts // Vibration Analysis, Engineering Review, and Automation Plan // Base Build Consulting Support // HPM Analysis
     
    Silterra (fka Wafer Technology) | Advanced CMOS, 200mm Wafer Fab, SMIF, 0.18 Micron
Awarded Top Fabs of 2002 by Semiconductor International Magazine, May 2002 // Class 1 to Class 1,000 Environment // Fan Deck, Cleanroom Raised Floor, Ballroom, Subfab // Copper and CMP Processes // Test and Failure Analysis // Layout Development/Optimization // Capacity Analysis // Utility Matrix // Tool Comparison // HPM Analysis // Automation Review // Base Build Consulting Support // EMI Evaluation for Characterization Areas
     
    Eastman Kodak | OLED Pilot Line
Layout, Facility Design and Construction Engineering Support // Fit Up Support Engineering // Process Analysis // Cost / Factory Model // Equipment Specification and Procurement // Process Specification Development and Outsourcing // Color Filter Technology, Process and Cost Analysis // Technology Transfer and Process Engineering Management Support
     
    Massachusetts Institute of Technology (MIT) | Microphotonics Lab
Si and III-V Fab, Assembly, Characterization // Layout // Utility Matrix // Cleanroom Consulting // Start-Up Consulting