AGI, Abbie Gregg, Inc.
  University of California Berkeley | Center for Information Technology Research in the Interest of Society (CITRIS), Marvell Nanofabrication Laboratory, Davis Hall North
     
  Project Features:
> Microlab Multistory Cleanroom Building with Subfab,
> Interstitial Levels, Waffle Slabs
> Unusual Site (Demo, Dual Building, Seismic Issues)
> Interface to 2 Existing Buildings
> Class 100 to class 1,000 on two levels (ISO Class 5, 6)
> 3” to 8” Substrates
> MOCVD – Significant HPM Usage / Storage
> Maskmaking
> Characterization
> Chemical / Gas Delivery from Hearst Avenue to
> HPM Storage Rooms
> Biofluidics and BioMEMS Process Applications
  Project Location:
> Berkeley, California
   
  Architectural Firm of Record:
> Johnson Fain Partners and
> SmithGroup Incorporated
   
  Project Size:
> 18,000 SF Cleanroom
> 97,750 gross SF in Project
   
  Construction Cost:
> $72 M
   
  Professional Services Provided:
> 2002 - 2004
   
  Project Status:
> Cleanroom Completed 2009
   
  Services Provided by AGI for Project:
> Programming, Schematic Design, Design Development,
> Construction Documents, Bid Packages
> Layout
> Utility Matrix Development
> HPM Analysis
> Tool Research, Relocation
> Specialty Systems Design
> Vibration and EMI Analysis
> Equipment Specification
> Value Engineering
> LEED Design
   
  Key AGI Personnel:
> Abbie Gregg, Cleanroom Consultant
> Craig Rossrucker, Cleanroom Consultant
> Mark Winter PE, Cleanroom Consultant