  SilTerra | Fab 1
     
  > Awarded 'Top Fabs' 2002 by Semiconductor International Magazine
  Project Location:
> Kulim, Malaysia
   
  Architectural Firm of Record:
> Fluor (ADP)
   
  Project Size:
> 180,000 SF Cleanroom
> 500,000 Gross SF in Project
   
  Construction Cost:
> $300M
   
  Project Status:
> Operating Fab
   
  Project Features:
> Green Site
> Advanced CMOS, 200mm wafer fab, SMIF, 0.18 Micron
> Class 1 to Class 1,000 Environment
> Fan Deck, Cleanroom Raised Floor, Ballroom, Subfab
> Copper and CMP Processes
   
  Services Provided by AGI for Project:
> Cleanroom Programming and Design
> Test and Failure Analysis
> Layout Development/Optimization
> Capacity Analysis
> Utility Matrix, Tool Comparison, HPM Analysis
> Automation Review
> Base Build Consulting Support
> EMI Evaluation for Characterization Areas
   