  PerkinElmer Optoelectronics | Sensor Panel for X-Ray Imaging Fab Expansion
     
  Project Features:
> Amorphous Silicon (a-Si) X-Ray Detectors
> Expansion to Existing Cleanroom
> Construction During Volume Ramp
> State of the Art FPD Tools, US and Asian Tool Vendors
> Structural Changes in Existing Building
  Project Location:
> Santa Clara, California
   
  Project Size:
> 23,000 SF Existing Fab

> 16,000 SF Renovation
>
39,000 SF Total Cleanroom
> Space
   
  Construction Cost : 
> Approx. $10 M
   
  Professional Services Provided : 
> 2006-07
   
  Project Status: 
> As of March 2008,
> Tool Installation and Start Up
   
  Services Provided by AGI for Project:
> Audit of Facility for Yield Improvement
> Analysis of ESD, Contamination, Production Flow,
> Bottlenecks, and Optimization of Work Flow
> Capacity Expansion Options Study
> Capacity Model for Expansion
> Study Tool/Layout/Utility Options for Gen 3-5 Glass Sizes
> Facilities Analysis and Design Consultation
> Assistance with Tool Acquisition / Relocation
> PECVD Tool Qualification
   
  Key AGI Personnel:
> Abbie Gregg, AGI Project Executive
> Mark Strnad, AGI Project Manager
> Craig Rossrucker, Industrial Engineer
> Mark Winter PE, Chemical Engineer
> Michelle Hartig, Industrial Engineer