www.abbiegregg.com

also see our staff bios

recent projects
        

AGI Industrial Wafer Fabrication Projects

 

Project / Location / Date

Scope of Work

 

 

ForCon

Atlanta, GA

2003 – 2005

       Process Equipment Damage Analysis

       Fair Market Valuation of Damaged Tools

       Develop Tool Repair Roadmap and Alternatives

 

Motorola

Tempe & Mesa, AZ

1995, 1998, 2003

 

       Bipolar 100mm, 150mm Wafers, 200mm Wafers

       Site Renovation Plans

       Fab Consolidation, Wafer Size Increases

       Phased Layout Scenarios

 

Fujitsu

Gresham, OR

2002

       200mm Memory Fab site

       Factory/Capacity and Cost Model

       Assist with Sale of Fab and Tools

 

Hynix Semiconductor

Korea

2002

       Multi Fab Audit

       Benchmark Wafer Costs

       300mm Wafer Fab Strategy

       DRAM Technology Integration Plan to 0.13 Micron

       Multi Fab Analysis

 

Medtronic

Tempe, AZ

2002

 

       Wafer Fab Capital Spending Plan

       Tool Recommendations

 

Luther Forest Technology Campus

Saratoga, NY

2000 – Present

 

       Two-Four Fab 300mm Wafer Processing Site

       Analysis of Wafer Fab Requirements

       Advanced Microprocessors or Memories

       Unique 1000 acre Green Site

       Verification that planned fab capabilities and design would meet the needs of the 3 largest Wafer Fabrication companies in the world

       Successfully Attracted and Sited Wafer Fabrication Facilities

       Economic Development and Incentives Modeling

       Vibration, RF, EMI and Acoustic Site Survey

       Environmental impact evaluation

       Community Education Activities

       Competitive $1.2 Billion Incentives

 

Philips Semiconductors

Albuquerque, NM

1999 – 2002

       BiCMOS, 0.25 to 0.18 Micron, 200mm Wafer Fab, SMIF

       75,000 Square Foot Renovation, including CMP Area

       Utility Matrix, Equipment and Room Layouts

       Vibration Analysis, Engineering Review, and Automation Plan

 

Silterra, formerly Wafer Technology

Kulim, Malaysia

1998 – 2002

 

 

       Awarded Top Fabs of 202 by Semiconductor International Magazine, May 2002

       Green Site

       Advanced CMOS, 200mm wafer fab, SMIF, 0.18 Micron

       Class 1 to Class 1,000 Environment

       Fan Deck, Cleanroom Raised Floor, Ballroom, Subfab

       Copper and CMP Processes

       Test and Failure Analysis

       Layout Development/Optimization

       Capacity Analysis

       Utility Matrix, Tool Comparison, HPM Analysis

       Automation Review

       Base Build Consulting Support

       EMI Evaluation for Characterization Areas

 

Littelfuse

Des Plaines, IL

1996 – 2002

       Thin film fuses.

       Manufacturing Technology.

       Wafer fab and Gas discharge.

       TVS acquisition evaluation.

       Technology Transfer

       Foundry Search and Evaluation

 

Wayne State University and Delphi Automotive Systems

Detroit, MI

2001 – 2002

       Microelectronics Cleanroom

       Renovation

       Programming

       Layout

       Utility Matrix

       Tool Relocation from Delphi Auto Research Labs to WSU

       Detail Design

       Construction Support

 

Knowles

Rolling Meadows, IL

2001

 

       Bipolar Wafer Fab

       Wafer Fab Maintenance and Equipment Engineering

       Process Setup

       Sale of Surplus Wafers

       Assistance with Technology Transfer/Outsource

 

Primarion

Phoenix, AZ

2001

 

       Bipolar/BiCMOS/Discrete Fab

       Fair Market Valuation

       Benchmark Fab Sales

 

Atmel

Irving, TX

2000 – 2001

       Operating Fab Building Acquisition

       137,000 square foot Cleanroom

       Site Evaluations to accommodate 0.18 micron process

       Class 1 to Class 1,000

       Multi Level Fab, 2 Subfab Levels, Fan Deck, Ballroom

       Layout for 200mm Tools

       Utility Matrix

       Room Condition Evaluation

       Capacity Analysis

       HPM Analysis

 

Micron Technology

Lehi, UT / Boise, ID

2000 - 2001

       300mm Wafer Fab DRAM

       Industrial Engineering

       Layout

       Utility Matrix

       Capacity Study / Site Studies

 

Motorola

Chandler, AZ

1997 – 2001

 

       Advanced CMOS, 200mm wafer fab, 0.35 Micron

       Equipment Maintenance:  Thin films, Ion Implant, CVD, Metrology.

 


Confidential Client

2000

 

       Bay/Chase vs. Ballroom Tool Layout Studies for 200mm and 300mm tool sets. 

 

Sarnoff

Princeton, NJ

2000

 

 

       Custom IC Fab

       Equipment/Process Analysis and Recommendations

FlipChip Technologies

Phoenix, AZ

1996, 2000 

 

       Bump Fab: 4”, 6”, 200mm Wafers

       Bottleneck Analysis/Modeling

       Cycle Time Improvement

       Tool Rigging, Wall Configuration, Tool Positioning, Fit-up

 

Ericsson Components

Stockholm, Sweden

1996 – 1999

 

 

       BIPOLAR, BiCMOS, CMOS wafer fabs, 0.35 Micron

       Evaluate 150mm conversion of existing wafer fabs.

       Layout optimization.

       Utility matrix development.

       Process optimization and operations turnaround.

       Extensive factory modeling for product mix changes.

       Equipment engineering and maintenance – etch, photo.

 

Texas Instruments, formerly Unitrode

Merrimack, NH

1997 –2000

       150mm BiCMOS Fab start-up, 0.6 Micron

       Fab start-up, Operations Management and Process Qualification.

       Tool installation and acceptance.

       Wafer process start-up, specification and process development.

       Etch, Diffusion, CVD, Multi level metal.

       Consult on 100mm to 150mm conversion of Bipolar Fab.

 

Advanced Micro Devices

Austin, TX

1994 – 2000

 

       Advanced CMOS microprocessors, Logic

       Course development and training:  Parametric Testing, Basic Electronics, Wafer Reliability, Semiconductor Physics and Wafer Sort, Class rating 4.8/5.

       Multiple fabs / site training support

 

GMT Microelectronics

Norristown, PN

1993 – 2000

 

       Silicon wafer foundry.

       Business plan development and market analysis .

       Process equipment maintenance.

Colorado Microdisplay

Boulder, CO

1997 – 1999

 

       LCD Microdisplay on 200mm wafers.

       Consult on process and automation of wafer and glass based FPD manufacturing, including wafer foundry and LCD assembly process.

       Consult on manufacturing strategies and management.

 

White Oak Semiconductor/DPR

Virginia

1996

 

       200mm wafer fab.

       Review of Conceptual Design.

Kopin Corporation

Taunton, MA

1996

       Miniature Transmissive Color LCD.

       Color filter process development, transfer to wafer fab foundry and production validation, including tool and cleanroom setup.

 

LSI Logic

Gresham, OR

1995

       200mm Green Site CMOS Wafer Fab

       Layout – SMIF Fab

       Utility Matrix

       Programming, Capacity Analysis, Modeling