Project /
Location
|
Scope of Work
|
Project
Information
|
|
||
|
|
|
|
|
||
|
2006 – Present |
•
Cleanroom Design: Programming thru Construction Documents •
Layout and Utility Matrix Development •
Tool Research and HPM Analysis •
Specialty Systems Design •
Tool Installation Design |
•
3,100 sq. ft. Renovation •
Nanotechnology Cleanroom •
HPM Corridor and Storage Areas •
Infrastructure Upgrades: Process, HVAC, Architectural, and
Life Safety Systems |
|
||
|
2003 – 2006 |
•
Peer Review of Design •
Alternate Design Recom •
Risk / HPM Analysis |
•
10,000 sq. ft. Cleanroom for Nanotechnology •
Class 100 to 1,000 •
Completed 2006 |
|
||
|
Molecular Foundry
Cleanroom 2003 – 2006 |
•
Layout, Utility Matrix •
Programming, SD, DD, CD, CA •
Specialty Systems, HVAC, EMI, Noise,
HPM Studies and Consulting |
•
4,592 sq. ft. Cleanroom for Nanotechnology •
Class 100 to 1,000 •
Phased Buildout •
Multilevel Building, Imaging Space below Cleanroom •
E-Beam Litho, Soft Litho •
FIB, •
Completed 2006 |
|
||
|
Becton Hall Cleanroom 2005 |
•
Feasibility Study •
Programming for User Needs •
Layout Options •
Utility Matrix •
HPM Analysis •
Tool Recommendations |
•
2,500 sq. ft. Cleanroom •
Renovation of Existing 5th Floor Interdisciplinary
Research Cleanroom •
Improve HVAC and Utilities Systems •
Accommodate New Tools and Processes •
Expand Clean Areas and Overall Cleanliness. |
|
||
|
Center for Nanoscale Science and Engineering
(CNSE) 2002 – 2005 |
•
Programming, SD •
Layout, Utility Matrix •
Tool Research •
HPM Analysis •
Retrofit of Labs •
Vibration and EMI Abate •
Peer Review •
Design Builder Selection Assistance |
•
1,900 sq. ft. Cleanroom •
Class 100 to 1,000 •
Donated Tools •
6” Wafers •
E-Beam Litho, FIB •
EMI Abate •
Competed 2005 |
|
||
|
Flexible 2003 – Present |
Support for ARL Flexible •
Building Acquisition o
Building Evaluation and Utilization Plan o
Environ o
Cleanroom Audit o
Building Business Plan Evaluation and Support o
Budget for Acquisition •
Proposal Support o
Tool List o
Support Business Plan, Technical
Plan, Operations Plan and Roadmap •
Site Organization and Layout •
Process Definition and Tool Set-up •
Facilities Audit, Planning, and Assist in Supervision during
Startup •
Process Qualification |
|
|||
2003 – Present |
•
As-built existing Cleanroom •
Programming, SD, CD •
Layout, Utility Matrix •
Tool Research •
HPM Analysis •
Specialty Systems Consulting •
HVAC Design and Code Evaluations •
Value Engineering |
•
9,000 sq. ft. Expansion of existing
9,000 sq.ft. Cleanroom •
Class 10 to Class 1000 •
Donated Tools •
6” Wafers •
•
E-Beam Litho •
MOCVD, MBE |
|||
|
Center for Interdisciplinary Engineering and Medical
Applied Sciences (CIEMAS) 2001 – Present |
•
Programming, SD, DD, CD, CA •
Layout, Utility Matrix •
Tool Research •
HPM Analysis •
Air Handling Evaluation •
Tool Fit-out / Hook-up Design |
•
7,500 sq. ft. Cleanroom •
Class 100 to 1,000 •
Characterization Labs •
Materials Synthesis |
|||
|
Laboratory for Interface Science and Engineering (LISE) 2001 – Present |
•
Programming, SD, DD, CD •
Layout, Utility Matrix •
Tool Research •
HPM Analysis •
Vibration and EMI Consulting •
Specialty Systems Design |
•
17,306 sq. ft. Cleanroom •
Class 10 to class 1,000 •
E-Beam Litho •
Imaging Suite •
Materials Synthesis •
BioTech Labs •
Demolition and Sitework •
Budget $100M •
Urban Area Issues |
|||
|
AZ Bio Design Institute 2003 – 2004 |
Site qualifications •
EMI, Vibration analysis and recom Phase 1 – Low
EMI Construction Consulting •
Imple •
Review of Drawing and Specification
sets for Construction Mitigation Methods •
Review Final EMI Verification
Reports Phase II •
Programming Docu •
Communicate BSL3/Select Agent
require |
•
Labs and Imaging Space for Advanced
Biotech Research •
4 phases | |||