www.abbiegregg.com

also see our staff bios

recent projects
        

AGI University and Government Lab Projects

 

Project / Location

Scope of Work

Project Information

 

 

 

 

 

University of Pennsylvania

Moore Nanofab Infrastructure Renovations

Philadelphia, PA

2006 – Present

 

        Cleanroom Design: Programming thru Construction Documents

        Layout and Utility Matrix Development

        Tool Research and HPM Analysis

        Specialty Systems Design

        Tool Installation Design

 

        3,100 sq. ft. Renovation

        Nanotechnology Cleanroom

        HPM Corridor and Storage Areas

        Infrastructure Upgrades: Process, HVAC, Architectural, and Life Safety Systems

 

 

University of Louisville

Belknap Research Building

Louisville, KY

2003 – 2006

 

        Peer Review of Design

        Alternate Design Recommendations

        Risk / HPM Analysis

 

        10,000 sq. ft. Cleanroom for Nanotechnology

        Class 100 to 1,000

        Completed 2006

 

 

Lawrence Berkeley National Labs

Molecular Foundry Cleanroom

Berkeley, CA

2003 – 2006

 

 

        Layout, Utility Matrix

        Programming, SD, DD, CD, CA

        Specialty Systems, HVAC, EMI, Noise, HPM Studies and Consulting

 

        4,592 sq. ft. Cleanroom for Nanotechnology

        Class 100 to 1,000

        Phased Buildout

        Multilevel Building, Imaging Space below Cleanroom

        E-Beam Litho, Soft Litho

        FIB, SEM

        Completed 2006

 

 

Yale University

Becton Hall Cleanroom

New Haven, CT

2005

 

        Feasibility Study

        Programming for User Needs

        Layout Options

        Utility Matrix

        HPM Analysis

        Tool Recommendations

 

        2,500 sq. ft. Cleanroom

        Renovation of Existing 5th Floor Interdisciplinary Research Cleanroom

        Improve HVAC and Utilities Systems

        Accommodate New Tools and Processes

        Expand Clean Areas and Overall Cleanliness.

 

 

University of California,

Riverside

Center for Nanoscale Science and Engineering (CNSE)

Riverside, CA

2002 – 2005

 

        Programming, SD

        Layout, Utility Matrix

        Tool Research

        HPM Analysis

        Retrofit of Labs

        Vibration and EMI Abatement Evaluation

        Peer Review

        Design Builder Selection Assistance

 

        1,900 sq. ft. Cleanroom

        Class 100 to 1,000

        Donated Tools

        6” Wafers

        E-Beam Litho, FIB

        EMI Abatement Required

        Competed 2005

 

Arizona State University

Flexible Display Center

Tempe, AZ

2003 – Present

 

Support for ARL Flexible Display Center Initiative

        Building Acquisition

o         Building Evaluation and Utilization Plan

o         Environmental Assessment

o         Cleanroom Audit

o         Building Business Plan Evaluation and Support

o         Budget for Acquisition

        Proposal Support

o         Tool List

o         Support Business Plan, Technical Plan, Operations Plan and Roadmap

        Site Organization and Layout

        Process Definition and Tool Set-up

        Facilities Audit, Planning, and Assist in Supervision during Startup

        Process Qualification

 

 

University of Michigan

Solid State Electronics Lab Cleanroom Expansion

Ann Arbor, MI

2003 – Present

 

        As-built existing Cleanroom

        Programming, SD, CD

        Layout, Utility Matrix

        Tool Research

        HPM Analysis

        Specialty Systems Consulting

        HVAC Design and Code Evaluations

        Value Engineering

 

        9,000 sq. ft. Expansion of existing 9,000 sq.ft. Cleanroom

        Class 10 to Class 1000

        Donated Tools

        6” Wafers

        CMOS, MEMS, GaAs, Organics

        E-Beam Litho

        MOCVD, MBE

 

Duke University

Center for Interdisciplinary Engineering and Medical Applied Sciences  (CIEMAS)

Durham, NC

2001 – Present

 

        Programming, SD, DD, CD, CA

        Layout, Utility Matrix

        Tool Research

        HPM Analysis

        Air Handling Evaluation

        Tool Fit-out / Hook-up Design

 

        7,500 sq. ft. Cleanroom

        Class 100 to 1,000

        Characterization Labs

        Materials Synthesis

Harvard University

Laboratory for Interface Science and Engineering (LISE)

Cambridge, MA

2001 – Present

 

        Programming, SD, DD, CD

        Layout, Utility Matrix

        Tool Research

        HPM Analysis

        Vibration and EMI Consulting

        Specialty Systems Design

 

        17,306 sq. ft. Cleanroom

        Class 10 to class 1,000

        E-Beam Litho

        Imaging Suite

        Materials Synthesis

        BioTech Labs

        Demolition and Sitework

        Budget $100M

        Urban Area Issues

 

Arizona State University

AZ Bio Design Institute

Tempe, AZ

2003 – 2004

 

Site qualifications

        EMI, Vibration analysis and recommendations for abatement.

Phase 1 – Low EMI Construction Consulting

        Implementation of EMI Mitigation Methods

        Review of Drawing and Specification sets for Construction Mitigation Methods

        Review Final EMI Verification Reports

Phase II

        Programming Documents

        Communicate BSL3/Select Agent requirements

 

        Labs and Imaging Space for Advanced Biotech Research

        4 phases