www.abbiegregg.com

also see our staff bios

recent projects
        

AGI Security Consulting Projects

 

 

Project / Location

Date

Scope of Work

 

University of Michigan

Ann Arbor, MI

 

 

 

2003 – Present

         Access, safety and security consulting

         Solid State Electronics Lab

         9,000 Square Foot Addition to existing Cleanroom

         Subfab, Class 10, MEMS, CMOS

         Submicron Lithography

         eBeam Litho

         Programming

         Layout, Utility Matrix, Specialty Systems and HVAC Consulting, HPM Analysis

 

Lawrence Berkeley National Labs Molecular Foundry

Berkeley, CA

2003 – Present

         Security Plan for Cleanroom and HPM Storage Areas

         Cleanroom for Nanotechnology Class 100-1000

         E-Beam Litho, Soft Litho

         FIB, SEM

         Phased Buildout

         Layout, Utility Matrix

         Cleanroom Design – Programming through Construction Documents

         Specialty Systems, HVAC, EMI, Noise, HPM Studies and Consulting

 

UC Riverside

Riverside, CA

 

 

2002 - Present

         Access, safety and security consulting

         Bourns Hall Cleanroom – opposite large classroom/public auditorium

         Programming and Conceptual Design

         Accommodate Donated Tools from Industry

         eBeam Litho

 

UC Berkeley

Berkeley, CA

2002 – Present

         Access, safety and security consulting

         Microlab Multistory Cleanroom Building

         Unusual Site (Demo, Dual Building, Seismic Issues)

         Programming, Schematic Design, Design Development

         Layout, Utility Matrix, HPM Analysis

         Tool Relocation

         Specialty Systems Design

         Vibration and EMI Analysis

         Equipment Specification

         Construction Documents, Value Engineering

         LEEDTM

 

Harvard University

Boston, MA

2001 – Present

         Access, safety and security consulting

         Physical Sciences Building

         New Construction (Connected to other buildings)

         Cleanroom/Imaging/Material Synthesis

         Layout, Utility Matrix

         Cleanroom Consulting

         Gas/Chemical Analysis

         Schematic Design, Value Engineering

 

Arizona State University

Tempe, AZ

1996 – Present

         Risk Assessment for Select Agent and Laboratory space

         Door access strategy for other high-risk spaces (H Occupancy Buildings, Securable Research Buildings, Haz Waste, Animal Containment Building, etc.

         Public Private partnership opportunity development

         Security considerations for Intellectual Property and compliance to funding agencies (NASA, NIH, DOE, etc.)

         Regulatory compliance work pursuant to Patriot Act, Homeland Security, CDC / others.

         Instructor CON 494/ 598 Introduction to Cleanroom

         Design/ Construction

         Microelectronics and Process Equipment

         One week Cleanroom Construction Workshop

         Vibration and EMI analysis – Light Rail Impact

         Vibration and EMI analysis – E-beam Litho Cleanroom

         Programming for new Nanotech Cleanroom (Layout, Conceptual Design, Utility Matrix, HPM Analysis)

         Site Evaluations – New Cleanroom and Biomed Buildings

         EHS Evaluation of Biosafety Labs

         VIB/EMI Analysis and Consulting for AZ Bio Design Site and Buliding

         Code Review, Recommendations and AsBuiltsASU Engineering Research Center

 

Duke University

Durham, NC

2001 – Present

         Access definition / Routing of personnel to meet code and safety

         Center for Interdisciplinary Engineering and Applied Sciences – New Construction – Cleanroom and Medical / Animal facility co-located in building with central core.

         Programming 

         Layout, Utility Matrix

         Schematic Design

 

Wayne State University

Detroit, MI

2001 – 2002

         Access, safety and security consulting

         Microelectronics Cleanroom

         Renovation (Technology and Research)

         Programming

         Layout, Utility Matrix

         Tool Relocation, Detail Design

 

Motorola Biochip

Tempe, AZ

2000 – 2002

         Bio Safety Lab (BLSII/III) Design and Construction

         Biochip Lab and Manufacturing Cleanroom Expansion

         Relocation Project Planning

         Tool List, CAD Footprints

         Utility Matrix

 

MIT, Massachusetts Institute of Technology

Cambridge, MA

2000 – 2001

         Microphotonics Lab

         Brown Site, Renovation, Multibuilding

         Labs and Cleanrooms – Open access priority, but significant use of HPMs and very expensive equipment.

         Silicon, III-V, Novel Materials

         Layout, Utility Matrix

         Cleanroom Consulting

         Tool Evaluation and Consulting

         Vibration Abatement Analysis

         Gas Cabinet, Bulk Gas, Chemical Analysis

 

Virginia Commonwealth University

Richmond, VA

1997

         Access, safety and security consulting

         Silicon/GaAs Wafer Fab for Teaching and Research

         Equipment Layout

         Tool Pricing / Selection

         Conceptual Design, Utility Matrix

 

Northwestern University

Chicago, IL

 

1989-1990

         Material and Life Sciences Building (Technology and Research)

         GaAs, Si, and other materials labs

         Lab layout

         Utility planning

         Cleanroom consulting

         Access, safety and security consulting

 

Columbia University

New York, NY

 

1988

         Silicon Fab for R&D.

         Teaching Fab for students.

         Lab layout

         Utility planning

         Cleanroom consulting

         HPM materials movement analysis

         Access, safety and security consulting

 

 

AGI  Abbie Gregg, Inc.  |  Engineering  |  Consulting  |  Helping the world turn technology into products.

1130 E. University Drive Suite 105  |  Tempe, AZ 85281 USA   |  Phone: 480-446-8000  |  Fax: 480-446-8001  |  www.abbiegregg.com